Construction Licence Ejecución Final del Proyecto

Real Estate for sale in Mallorca Documentation; Ejecución Final del Proyecto, Contact us or read our blog Mallorca Property Guru. Property Sales Mallorca Once the building licence has be granted Proyecto Básico or during the period waiting for it to be granted, the architect continues to develop the project working with an aparejador (quantity surveyor / civil engineer) is in normally discribed as Project Ejecución Final del Proyecto. Builders are asked to quote for the construction, using the plans materials, and appliances provided to them by the architect and aparejador. As the construction begins the role of the aparejador increases controlling the execution of the work to make sure it is done according to the architect’s project. The local planning authority will require proof that the construction and all of its features have been executed correctly before they provide the final certification for the construction.

During this phase it is not possible to change the location of the proposed construction on the plot or the area which the construction occupies. It is possible to change elements of the interior distribution in consultation with the local planning authority.

If you are buying a plot with a construction license Proyecto Básico and wish to change elements of the design before you purchase is the time to discuss the changes with the architect and vendor.

2 Propiedades
Sort by:

Compare listings

Compare